Free site visit
Surveyed on site, not priced from a phone call.
Sign for work in your own home and you can cancel within fourteen days, no reason needed. The trader must give you that notice in writing — and if they do not, the law extends your right to a full year. We hand it over before any deposit.
The written cancellation notice comes before any deposit, on every contract signed in your home.
Developing and building projects, from extensions to substantial alterations.
See the programConstruction installation work, with notifiable trades going to registered people.
See the programBuilding completion and finishing work, with what is underneath checked first.
See the programSpecialised construction work, with licensed and reserved work referred out.
See the programSurvey on site, quote with the exclusions written in, hand over the cancellation notice before any deposit, send notifiable and licensed work to registered people, and obtain the certificates at the end.
Surveyed on site, not priced from a phone call.
In writing, before we take a penny.
Progress reported, inspections arranged.
Completion, electrical and window certificates.
Quoted per project after a site visit. Asbestos surveys, licensed removal and reserved trades are referred and priced separately.
One piece of work, surveyed and quoted.
An extension, conversion or whole-house project.
Said plainly, because the law reserves it.
Every engagement is quoted after a free consultation. No subscription.
Her Home Improvements Ltd is a private limited company registered in England and Wales under company number 10915638, based at Powder Mill Lane in Dartford and trading since August 2017 under the same director. The work covers building projects, construction installation, completion and finishing, and specialised construction work across Dartford and north-west Kent.
Home improvement is the sector that consumer cancellation law was written for, and it still gets ignored. A contract signed in your own home is an off-premises contract: you have fourteen days to cancel without giving a reason, and the trader must give you the prescribed notice in writing. If they do not, the cancellation period extends by twelve months — so a trader who skips the paperwork has handed the customer a year-long right to walk away. We provide the notice with every quotation accepted away from our premises, before any deposit. We also do not ask for a deposit out of proportion to the work. Notifiable electrical work goes through a Part P registered person, all gas work to a Gas Safe engineer, and pre-2000 buildings get an asbestos survey before intrusive work.
Almost certainly, yes. A contract signed in your own home is an off-premises contract and you have fourteen days to cancel without giving a reason. If the trader never gave you the prescribed cancellation notice in writing, that period is extended by twelve months. Check what paperwork you were given; if there was none, you are likely still inside your right to cancel.
Because it is the law and because a trader who hides it is telling you something about how the rest of the job will go. It also protects us: if we never gave you the notice, we would be exposed to a cancellation a year later on a project we had already resourced. Doing it properly suits both sides.
If you asked us in writing to start within the cancellation period and the work is fully done, the right is lost for that completed service. If work has begun but is not finished, you can still cancel and pay for what has actually been supplied. We set this out in the notice rather than leaving it vague, because it is the part people argue about.
Because replacement windows must either be inspected by building control or certified by an installer registered with a competent person scheme, and that certificate is what a buyer's conveyancer will ask for. Homeowners typically discover it is missing years later, mid-sale, and sorting it retrospectively is far harder than getting it at the time.
The electrics yes, through a Part P registered person with the certificate provided. Gas no, not ourselves: all gas work must be done by a Gas Safe registered engineer, and we coordinate one into the programme rather than improvising. Any builder who offers to do gas work themselves without that registration is a problem.
Enough to cover materials that have to be ordered, and stated for what it is. We do not ask for a large proportion of the contract up front, which is the pattern that leaves homeowners exposed. If a trader wants half the money before starting, ask what it is actually for.
A free site visit and a written quotation, with your cancellation rights set out.